Wardell Boardwalk

Boardwalk Construction - Bridge Drive, Wardell

Delivering Ballina Shire Council's Capital Works Program

Map is illustrative and not to scale. Copyright Land & Property Information 2016. 

Boardwalk construction

The project comprises the construction of a 3 metre wide timber boardwalk along Bridge Drive, Wardell between the existing village jetty and towards the Pacific Highway overbridge.

The boardwalk will be approximately 70 metres long, and will be built along the section of Bridge Drive where there is very narrow river bank edge. The boardwalk will provide pedestrian access along this very narrow river bank edge.

Construction period

The boardwalk construction will be undertaken by contractors, Bell Rock Marine, and is now scheduled to be completed mid-May 2017. The contractor commenced piling work in late September for two weeks with a local subcontractor, and then finished the piling work in late November 2016. The contractor was off-site for the December and January holiday period and resumed 1 March 2017. The project has been delayed in this early stage due to an administrative matter with the renewal of a Licence from the Department of Industry (Lands) and a subsequent Permit from the Department of Primary Industries (Fisheries).   

Footpath construction

Following completion of the boardwalk by Bell Rock Marine, it will be Council’s task to finish a concrete path connection from the boardwalk, under the highway overbridge and through to the Cedar Street intersection.

Cost of project

The total project budget for the Wardell boardwalk and footpath is $540,000.

Enquiries

Paul Busmanis, Engineering Works Manager, Ph 6686 4444.